The Elizabeth line in numbers

The Elizabeth line has finally opened.

Here are some key numbers for London’s new railway:

– How much did it cost?

The National Audit Office estimated the final cost for the Crossrail project to build the railway will be £18.9 billion.

– What was the budget?

It was set a budget of £14.8 billion in 2010.

– How long was the delay in opening?

Three and a half years.

– How long is the railway?

The entire line stretches for more than 60 miles, including a pair of tunnels each 13 miles long under London.

The project was delayed and over budget (Dominic Lipinski/PA)

– How many stations does it have?

41, including 10 new ones.

– What is the increase in central London’s rail capacity?

10 per cent.

– How long are the trains?

They are 200 metres long, with nine carriages.

– How many passengers can each train hold?

Up to 1,500.

– How many people are expected to use the Elizabeth line?

Annual passenger numbers are estimated to reach 170 million by 2026.


Douglas Mateo

Douglas holds a position as a content writer at Neptune Pine. His academic qualifications in journalism and home science have offered her a wide base from which to line various topics. He has a proficiency in scripting articles related to the Health industry, including new findings, disease-related, or epidemic-related news. Apart from this, Douglas writes an independent blog and assists people in living healthy life.

Source Link The Elizabeth line in numbers